Rezé2025Roof renewed, dormer restored
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles12 days
Fill in the form: we call you back within one working day to book a visit, then send a detailed quote.
No obligation. One request, one roofer, one call back.

Who reads your request
Your request lands with the roofer who will climb onto your roof. It is not sold on to four companies who will all call you at dinner time.
Ten-year insurance
The certificate comes with every quote.
RGE certified
The condition for insulation grants.
Safety before climbing
Scaffolding or guardrails in place before the first tile comes off.
What we price
from €290Tiles blown off, a branch through the roof: we make it watertight the same day and document everything for your insurer.
from €180A stain on the ceiling rarely sits under the leak. We find where the water really gets in, then repair only what needs repairing.
from €120 per m²Clay tiles, battens and underlay renewed, the rafters checked on the way: a roof done for the next fifty years.
from €160 per m²Natural slate, hooked or nailed, laid by hand: the roof of the region, for the life of the house.
from €55 per metreGutters, downpipes, flashings and ridge in zinc, shaped and soldered on site to fit your roof.
from €18 per m²Moss removed by hand and a treatment applied, only when the roof needs it. We tell you when it does not.
Recent jobs
Requests like yours, once the work was done.
Rezé2025A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Interlocking clay tiles12 days
Orvault2025A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.
Natural slate, hooked4 weeks
Nantes2024A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.
Natural zinc9 days
Carquefou2025A dark loft turned into two bedrooms, three windows cut into the tiled slope.
Roof windows and flashing kits3 days
Vertou2024Rotten rafters found when stripping the roof, replaced before the new covering went on.
Treated softwood6 days
Saint-Sébastien-sur-Loire2024Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.
Reclaimed canal tiles8 days
From the first call to the handover
We climb onto the roof before pricing anything, and send you the photos of what we saw.
Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.
The roof is made watertight every evening, even halfway through the job.
We walk round the job with you and you sign the handover: the ten-year cover starts that day.
Good to know
Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.
A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.
Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.
We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.
For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.
It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.
If your town is on the list, the visit comes within the time shown.
Once the scaffolding came down
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L.
Storm tarping, Rezé
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M.
Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V.
Slate roof renewal, Carquefou
Asking costs nothing, and after one visit you will know exactly what your roof needs.