Visit and quote free of charge

Your roof, priced in writing after one visit.

Fill in the form: we call you back within one working day to book a visit, then send a detailed quote.

  • A roofer answers, never a call centre
  • Your details are never resold
  • Ten-year insurance certificate with the quote
01 23 45 67 89

Describe your roof

No obligation. One request, one roofer, one call back.

Who reads your request

A roofing firm, not a lead broker

Your request lands with the roofer who will climb onto your roof. It is not sold on to four companies who will all call you at dinner time.

Ten-year insurance

The certificate comes with every quote.

RGE certified

The condition for insulation grants.

Safety before climbing

Scaffolding or guardrails in place before the first tile comes off.

Recent jobs

Roofs we have done

Requests like yours, once the work was done.

Rezé2025

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

Interlocking clay tiles12 days

Orvault2025

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

Natural slate, hooked4 weeks

Nantes2024

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

Natural zinc9 days

Carquefou2025

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

Roof windows and flashing kits3 days

Vertou2024

Rafters replaced before re-roofing

Rotten rafters found when stripping the roof, replaced before the new covering went on.

Treated softwood6 days

Saint-Sébastien-sur-Loire2024

Canal tiles re-laid on a stone house

Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.

Reclaimed canal tiles8 days

From the first call to the handover

From the form to the finished roof

1

We come and look

We climb onto the roof before pricing anything, and send you the photos of what we saw.

2

A written, detailed quote

Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.

3

The work, on the agreed dates

The roof is made watertight every evening, even halfway through the job.

4

Handover and guarantee

We walk round the job with you and you sign the handover: the ten-year cover starts that day.

Good to know

Before you sign anything for your roof

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

Where we work

If your town is on the list, the visit comes within the time shown.

Carquefou44470within 48 h
La Chapelle-sur-Erdre44240within 48 h
Nantes44000within 24 h
Orvault44700within 48 h
Rezé44400within 24 h
Saint-Herblain44800within 24 h
Saint-Sébastien-sur-Loire44230within 24 h
Vertou44120within 48 h

Once the scaffolding came down

What customers said

"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."

Sandrine L.

Storm tarping, Rezé

"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."

Gérard M.

Leak repair, Orvault

"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."

Claire and Julien V.

Slate roof renewal, Carquefou

Still hesitating?

Asking costs nothing, and after one visit you will know exactly what your roof needs.